GBA Presents: THE GREEN MARKET

Discussion in 'Stocks' started by stonedinvestor, Sep 13, 2021.

  1. Man my eyes!!!

    You are right Van TSP is $36 I saw $38 on the ticker I thought
     
    #1451     Oct 20, 2021
  2. Van can NEXTPLAY IN GRANNY'S SHORTS!

    NXTP 11:00 10/20/21

    White Diamond issues short report on NextPlay Technologies with 30c target
    Short selling firm White Diamond Research issued a report on NextPlay Technologies (NXTP) with a 30c price target. The stock in morning trading is down 15% to $2.13. NextPlay's actual revenues for its latest quarter were less than one thousand dollars and it is paying $10M-plus "for strange companies in different countries that have no revenues and no customers," White Diamond says in its report. Axion Ventures (AXNVF), now trading close to zero, was run by the same executives of NextPlay, and is a "hotbed of lawsuits, self-dealing and related party transactions," the firm adds.


    NXTP NextPlay Technologies
    $2.26 /
    -0.27 (-10.67%)
     
    #1452     Oct 20, 2021
  3. I wonder if GBA should open a short division. It may be easier. I know Scott likes it but Shake Shack looks weak to me.

    $74.40

    -2.36 (-3.07%)

    • 04

      Nov
    10/11/21 Piper Sandler
    Shake Shack price target lowered to $100 from $131 at Piper Sandler
    10/05/21 Loop Capital
    Shake Shack initiated with a Hold at Loop Capital
    08/06/21 Oppenheimer
    Shake Shack price target lowered to $115 from $124 at Oppenheimer
    08/06/21 Barclays
    Shake Shack price target lowered to $85 from $92 at Barclays

    I mean these guys won't tell you the truth they'll still have a high PT or still have good things to say-- to me this is outright negative. Scott talking this up like LESL...


    Shake Shack price target lowered to $100 from $131 at Piper Sandler 10/11
    SHAK
    Piper Sandler analyst Nicole Miller Regan lowered the firm's price target on Shake Shack to $100 from $131 and keeps an Overweight rating on the shares. The current stock price appears to reflect a "muted tone" in regard to the suburban sales recovery remaining fairly flat and ability to take price against commodity inflation, Miller Regan tells investors in a research note. The analyst's new target reflects downwardly revised 2022 estimates.
     
    #1453     Oct 20, 2021
  4. SMASH burger is big now in NYC.

    & personally Pasti's Americana burger is really really good-
     
    #1454     Oct 20, 2021
  5. SILV.png
    This news is a couple months old, but relevant. They're ahead of schedule and under budget. Plant should come on line early next year. I'd rather be early than late to this party.
    SilverCrest Provides Las Chispas Construction Update (CNW Group/SilverCrest Metals Inc.)

    Highlights

    • Construction Tracking on Schedule – At the end of the first half of 2021 ("H1, 2021"), Las Chispas construction progress was 33% complete compared to scheduled completion of 28%. Construction has progressed well with the confined COVID-19 camp facility and earthworks completed, concrete foundation work 74% complete, plant tank construction and key infrastructure projects (powerline, road, and bridge) commenced, underground infrastructure ongoing, and plant detailed engineering 90% complete. Construction progress has benefited from no delays due to COVID-19 or any other reason.

    • Capital Spend In-line with Budget – In H1, 2021, 60% of the $137.7 million capital cost estimate was committed, of which 35% has been spent across all capital cost scopes, in-line with budget. A significant component of the initial capital cost is the process plant which is a fixed price Engineering, Procurement, and Construction ("EPC") contract with Ausenco Engineering Canada Inc. This contract represents approximately 39% of the initial capital cost estimate in the Feasibility Study*, limiting the risk of cost inflation for the process plant.

    • Underground Development Well Advanced – 4.6 kilometres ("km") of underground development was completed in H1, 2021 for a total of 13.1 km since underground development began in Q1, 2019. Access has been established in four (4) veins or areas and 33 in-vein work fronts. The combination of higher productivity, favourable ground conditions, and cost control have contributed to development costs tracking slightly under budget. Overall, development metres were ahead of budget in H1, 2021.

    • Optimization Work Ongoing – Work is underway to further improve the project with a focus on optimizing the underground mine design and schedule. This work has included a review of the Feasibility Study Life of Mine plan ("LOM") to assess areas for improvement. This has included the ongoing development of an exploration drift to the high-grade Babi Vista Splay Vein to better understand this opportunity, which is currently not part of the LOM. As planned, work is also underway to validate metallurgical results from all underground exposed veins, well in advance of plant commissioning in late Q2, 2022.
     
    #1455     Oct 20, 2021
  6. How much of Silver Crest's budget is for paying off local governments & the police. Mexico is a nightmare!
     
    #1457     Oct 20, 2021
  7. Silver or lead, and they got enough of both. :cool:
     
    #1458     Oct 20, 2021
  8. #1459     Oct 20, 2021
  9. I DUMPED IT YESTERDAY VAN
     
    #1460     Oct 20, 2021