Discussion in 'Hardware' started by TIKITRADER, Jul 4, 2011.
bay drives
wire drives
cable management
continue wiring
arranging wires to install
audio to mb
prep switches and power
attached pwr and switches
prepare to install 3 graphics cards
video cards installed
Separate names with a comma.